Project Information
Pipework and Fabrication drawing for the Wastewater Treatment Plant
Description
Client
A UK-based EPC company operational across different industry verticals that were assisting spool and structure fabrication for oil & gas, water & wastewater, and manufacturing sectors.
Engineering Requirement
Rishabh Engineering team developed the 3D model for all the types of equipment and piping assembly along with the pipe support and complete fabrication package for all the aboveground piping for two sites.
Delivered
- Equipment & Pipework 3D model
- GAD with MTO
- Spool fabrication drawing
- Pipe Support Design and Drawing
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent blogs
This article emphasizes the value of industrial product design, while providing instances of its effects in the real world and explains how working with multidisciplinary engineering firms like Rishabh Engineering can help streamline the manufacturing processes.
This article covers key objectives, stages, and challenges of chemical process design, emphasizing optimization, multidisciplinary collaboration, tools, and equipment considerations to ensure safe, efficient, and sustainable operations in chemical plants.
The pre-bid stage is essential in engineering projects since it can determine the project's outcome before any on-site work begins. Businesses work hard to produce precise, compelling, and competitive offers during this phase. Here, multidisciplinary design engineering businesses are crucial since they provide knowledge from various fields. Their support improves the quality of bids, minimizes risks, and sets a strong foundation for smooth project execution.