3714 Harvey Penick Drive, TX 78664
Stay connected:
Doosan_11-940x626.jpg

Description

Client

South Korea based organization providing international-grade design, engineering & construction services to all kind of power plants since last 20 years. They are also engaged into various SOC projects like building subways, highways, highway railroads, apartments and commercial buildings.

Engineering Requirement

  • Equipment modeling of PPA, HRSG (Heat Recovery Steam Generator), HP (High Pressure) & LP (Low Pressure) drums, silencers, main stack, bypass stack & blow down tank and pumps
  • Complete structural modeling of HRSG, inlet duct, main stack platforms, bypass stack platforms, stairs platform and ladders
  • Design & modeling of complete piping arrangement including small bore lines
  • Marking & modeling of all physical supports
  • Extraction of Stress isometrics, system isometrics & fabrication isometric drawings
  • Preparation of complete MTO in Excel format
  • Preparation of GA drawings

Delivered

Rishabh Engineering Services (RES) successfully executed this project by employing the Offshore Delivery Model to carry out Piping Detailed Engineering and 3D Modeling activities for both the plants.

Want to know more about this project?

Ready to work with us? Tell us more

    Yes, I am OK to receive further communication over my details shared here.Refer privacy policy for more info.

    Our Recent Blogs

    Industrial Product CAD Design

    Role of Industrial Product CAD Design in Driving Innovation and Efficiency

    This article emphasizes the value of industrial product design, while providing instances of its effects in the real world and explains how working with multidisciplinary engineering firms like Rishabh Engineering can help streamline the manufacturing processes.
    Process Design In Chemical Engineering

    Chemical Process Design: How Multidisciplinary Teams Drive Efficiency

    This article covers key objectives, stages, and challenges of chemical process design, emphasizing optimization, multidisciplinary collaboration, tools, and equipment considerations to ensure safe, efficient, and sustainable operations in chemical plants.
    Pre-bid Engineering Phase

    Pre-Bid Process In Multidiscipline Engineering

    The pre-bid stage is essential in engineering projects since it can determine the project's outcome before any on-site work begins. Businesses work hard to produce precise, compelling, and competitive offers during this phase. Here, multidisciplinary design engineering businesses are crucial since they provide knowledge from various fields. Their support improves the quality of bids, minimizes risks, and sets a strong foundation for smooth project execution.