Project Information
Piping stress analysis & 3D modeling for critical lines of Heaters using CAESAR II & PDS
Description
Client
The client is a leading heater manufacturer in South Korea that engages in the construction, maintenance, and revamping of fired heaters and air cooled condensers
Engineering Requirement
- 3D modeling and pipe stress analysis of Heaters
- Piping modeling
- Piping support modeling
- Stress analysis of stress critical lines
- Integration of structural model from Tekla X Steel to PDS
- Modeling of utility lines
Delivered
- Isometric drawings
- Consolidated piping – MTO in Excel format
- Piping GA’s drawing
- Final 3D model
- Stress report
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent Blogs
This article emphasizes the value of industrial product design, while providing instances of its effects in the real world and explains how working with multidisciplinary engineering firms like Rishabh Engineering can help streamline the manufacturing processes.
This article covers key objectives, stages, and challenges of chemical process design, emphasizing optimization, multidisciplinary collaboration, tools, and equipment considerations to ensure safe, efficient, and sustainable operations in chemical plants.
The pre-bid stage is essential in engineering projects since it can determine the project's outcome before any on-site work begins. Businesses work hard to produce precise, compelling, and competitive offers during this phase. Here, multidisciplinary design engineering businesses are crucial since they provide knowledge from various fields. Their support improves the quality of bids, minimizes risks, and sets a strong foundation for smooth project execution.