An aging plant has typically been operating over several decades and is likely to have gone through significant changes. It would range from modifications to expansions and design changes. You would agree as the asset gets older several challenges inevitably arise.
Essential Safety Considerations for Design Engineering
An aging plant has typically been operating over several decades and is likely to have gone through significant changes. It would range from modifications to expansions and design changes. You would agree as the asset gets older several challenges inevitably arise.
How Smart 3D Modeling Helps Add Value to Managing Aging Plants
An aging plant has typically been operating over several decades and is likely to have gone through significant changes. It would range from modifications to expansions and design changes. You would agree as the asset gets older several challenges inevitably arise.
Importance of Carbon Collection From Petrochemical Plant
The global economy will never be the same as it was before the global pandemic that disrupted all walks of life. The major reason for the same area is as follows.
Piping Stress Analysis For Cryogenic Systems
Cryogenic piping systems are used in a range of industrial applications including LNG transport, storage and regasification, Hydrogen storage and transport and the food and beverage sector. They must be designed to withstand operational stresses and displacements while also regulating thermal forces.
Managing Successful Engineering Design Outcomes in the “New Normal”
The COVID-19 outbreak had completely changed the way, how we live, do business and the way our economy functions as a whole. We’ve witnessed projects having difficulty in ramping up—and then down—to meet the demands of mandates and needed responses.
Changing Dynamics of Design Engineering Business With Innovative Solutions
The oil & gas industry has always been the center of the global economy. Its demand and supply matrix always impacts the prices of the commodity across the globe.
Impact of Changing US Administration on the Brownfield Projects
Brownfield projects are usually carried out on already established project sites. The assignment could be as small as replacing the existing pump due to non performance or completion of lifecycle to expansion of the plant.
COVID-19: Playing Our Part in the Fight Against the Global Health Crisis
Amid the uncertainty inundated by COVID-19 outbreak, our hearts go out to everyone impacted by the virus either directly or indirectly. At Rishabh Engineering, our priority is the health and…
Rishabh Engineering Services Wins Drivers of Success Award Fourth Year in a Row at HxGN LIVE 2019
Las Vegas, Nevada, June 13, 2019: Rishabh Engineering Services (RES) wins the “Drivers of Success Award” for the year 2019 at HXGN LIVE event this week. As the fourth time…