Project Information
Stress Analysis For Power Boiler Steam Piping
Description
Client
An Asia-based quality auditor for power plants across various phases including, Design, Construction, Operation, and shut down with the experience in performance testing of boilers, training the operating personnel, shutdown audit of boilers, along with specifying & review of power plant equipment.
Engineering Requirement
Rishabh Engineering, as an engineering services partner, conducted the pipe stress analysis of boiler steam pipes from low temperature to high temperature, along with an evaluation of existing support, and possible proposals for the new hanger support.
Delivered
- Pipe Stress Analysis Report
- Isometric Drawings
- Design Data Sheet of Hanger Support
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)