3714 Harvey Penick Drive, TX 78664
Stay connected:
Piping-Stress-Analysis-of-Group-Gathering-Station.png

Description

Client

A Dubai based major EPC contractor that specializes in the Energy, Industrial and Infrastructure sectors with a successful track record of executing projects in over 20 countries in the Middle East, Europe, Africa, India and South-East Asia.

Engineering Requirement

  • Piping Stress Analysis using CAESAR II on 35 systems (225 lines) of the Group Gathering station in a sequence of 2 phases for Above Ground & Under Ground piping systems and subsequently submit Stress Isometrics for final IFC (Issue for Construction).

Delivered

  • Stress Isometric
  • CAESAR II Plot
  • Input Echo
  • Stress Summary Report
  • Restraint Load Summary Extended Report
  • Displacement Report
  • Nozzle Load Check Report
  • Dynamic Modal Analysis Report
  • WRC Report

Want to know more about this project?

Ready to work with us? Tell us more

    Yes, I am OK to receive further communication over my details shared here.Refer privacy policy for more info.

    Our Recent Blogs

    Management of Change Project Challenges

    Overcoming Management of Change (MoC) Implementation Challenges

    The intricacies of MoC challenges are examined in this article, along with how Rishabh Engineering uses its experience to handle them successfully.
    AIV and FIV analysis for FPSOs

    Acoustic & Flow Induced Vibration Analysis for FPSO

    We'll go over what is flow induced and acoustic induced vibration analysis, how it impacts FPSO projects, and how a multidisciplinary design engineering firm like Rishabh Engineering can assist lower these risks.
    Hydrogen Balance of Plant Design and Integration

    Hydrogen BoP Design: Considerations, Tools, Challenges & Solutions

    This article looks at the critical elements of Hydrogen BoP, essential design factors, and the function of multidisciplinary engineering knowledge in guaranteeing effective, secure, and economic systems.